VW Autohaus Permanent Retaining Wall
RWH Engineering and HCM assisted Ledcor with the design and construction of a permanent retaining wall related to their VW Autohaus project in Barrie, Ontario. RWH designed a permanent caisson wall shoring system complete with [...]
Rail Bridge Rehabilitation
HCM Shotcrete assisted Ontario Northland Transportation Commission with the restoration of an existing reinforced concrete rail bridge in Kirkland Lake, Ontario. HCM Shotcrete’s work included concrete removals, reinforcing steel preparation, concrete replacement, and rip rap [...]
Parking Garage Soffit Repair
HCM Shotcrete is currently completing 15,000 square feet of dry-process shotcrete placement on the underside of a parking garage roof deck in Scarborough, Ontario.
HWY 401 and HWY 62 Underpass Rehabilitation
HCM Shotcrete assisted Dalcon Enterprises Inc. with shotcrete application related to their (MTO) Hwy 401 and Hwy 62 Underpass project. HCM completed shotcrete placement related to reinforced concrete repairs for existing girders, soffit elements, and [...]
Barrie Waste Water Treatment Rehab
HCM Shotcrete assisted the City of Barrie care of BGL with the restoration of two reinforced concrete aerobic reactor tanks. The tanks were deteriorated above the water line due to microbially induced corrosion (MIC) – [...]
Royal Botanical Gardens
Royal Botanical Gardens underwent recent renovations (designed by Janet Rosenberg & Studio) to restore the 80 year old garden including repairing deteriorated features and introducing new elements. Repairs and new elements were designed to respect [...]
UTAS Landing Gear Plant
HCM Shotcrete assisted Silverline Construction in the construction of a nickle plating machine pit at the UTAS landing gear plant. The machine pit was built in the center of an operating landing gear manufacturing facility. [...]