RWH Engineering and HCM assisted Ledcor with the design and construction of a permanent retaining wall related to their VW Autohaus project in Barrie, Ontario. RWH designed a permanent caisson wall shoring system complete with shotcrete facing and HCM completed the construction of these elements. Ledcor’s client required maximum utilization of the site. In order [...]
Parking Garage Soffit Repair
HCM Shotcrete2015-08-20T23:55:24-05:00HCM Shotcrete is currently completing 15,000 square feet of dry-process shotcrete placement on the underside of a parking garage roof deck in Scarborough, Ontario.
HWY 401 and HWY 62 Underpass Rehabilitation
HCM Shotcrete2015-03-21T22:04:03-05:00HCM Shotcrete assisted Dalcon Enterprises Inc. with shotcrete application related to their (MTO) Hwy 401 and Hwy 62 Underpass project. HCM completed shotcrete placement related to reinforced concrete repairs for existing girders, soffit elements, and abutment walls in both Eastbound and Westbound lanes. HCM’s MTO certified nozzlemen used King MS-D1 dry mix shotcrete to complete [...]
Barrie Waste Water Treatment Rehab
HCM Shotcrete2015-03-21T21:48:35-05:00HCM Shotcrete assisted the City of Barrie care of BGL with the restoration of two reinforced concrete aerobic reactor tanks. The tanks were deteriorated above the water line due to microbially induced corrosion (MIC) – deterioration that is common to aerobic environments (man holes, sewer pipes, bio-reactors, etc.). HCM Shotcrete addressed the MIC by removing [...]
UTAS Landing Gear Plant
HCM Shotcrete2015-03-21T18:13:47-05:00HCM Shotcrete assisted Silverline Construction in the construction of a nickle plating machine pit at the UTAS landing gear plant. The machine pit was built in the center of an operating landing gear manufacturing facility. Access to the plant was limited to a man door 110m from the work area. HCM placed shotcrete directly against [...]