Featured

Home/Featured

VW Autohaus Permanent Retaining Wall

2018-05-03T18:43:23-05:00

RWH Engineering and HCM assisted Ledcor with the design and construction of a permanent retaining wall related to their VW Autohaus project in Barrie, Ontario. RWH designed a permanent caisson wall shoring system complete with shotcrete facing and HCM completed the construction of these elements. Ledcor’s client required maximum utilization of the site. In order [...]

Rail Bridge Rehabilitation

2018-05-03T16:26:54-05:00

HCM Shotcrete assisted Ontario Northland Transportation Commission with the restoration of an existing reinforced concrete rail bridge in Kirkland Lake, Ontario. HCM Shotcrete’s work included concrete removals, reinforcing steel preparation, concrete replacement, and rip rap placement. Due to the remote nature of Ontario Northland’s rail assets, the work site was only accessible via high rail [...]

HWY 401 and HWY 62 Underpass Rehabilitation

2015-03-21T22:04:03-05:00

HCM Shotcrete assisted Dalcon Enterprises Inc. with shotcrete application related to their (MTO) Hwy 401 and Hwy 62 Underpass project. HCM completed shotcrete placement related to reinforced concrete repairs for existing girders, soffit elements, and abutment walls in both Eastbound and Westbound lanes. HCM’s MTO certified nozzlemen used King MS-D1 dry mix shotcrete to complete [...]

Barrie Waste Water Treatment Rehab

2015-03-21T21:48:35-05:00

HCM Shotcrete assisted the City of Barrie care of BGL with the restoration of two reinforced concrete aerobic reactor tanks. The tanks were deteriorated above the water line due to microbially induced corrosion (MIC) – deterioration that is common to aerobic environments (man holes, sewer pipes, bio-reactors, etc.). HCM Shotcrete addressed the MIC by removing [...]

Royal Botanical Gardens

2015-03-21T21:50:09-05:00

Royal Botanical Gardens underwent recent renovations (designed by Janet Rosenberg & Studio) to restore the 80 year old garden including repairing deteriorated features and introducing new elements. Repairs and new elements were designed to respect the heritage nature of the garden. HCM assisted IRA McDonald Construction in the installation of a reinforced concrete, water retaining, [...]

UTAS Landing Gear Plant

2015-03-21T18:13:47-05:00

HCM Shotcrete assisted Silverline Construction in the construction of a nickle plating machine pit at the UTAS landing gear plant. The machine pit was built in the center of an operating landing gear manufacturing facility. Access to the plant was limited to a man door 110m from the work area. HCM placed shotcrete directly against [...]

Go to Top